Atm-95 hot melt cart
【Summary Description】 Operation instructions steps: (1) Place the gas cylinder on the hot melt cart, close all valves, and connect the coal and chlorine pipelines. (2) Hang the required hopper for construction, insert it into the gas pipeline, and check the microbead distribution system. (3) Adjust the pointer at the reference line of the construction site. (Align the alloy strip of the blade with the water line in the hopper, then align the pointer with the water line) (4) Open the gas cylinder switch, ignite the ignition gun, then gradually turn on the oil tank heater and the hopper burner, check if the burner is working properly, after preheating, place the paint on the hot melt kettle and fill the bead box with glass beads. (5) One pointer, lower the hopper, open the door, place the paint in the hopper, then open the hopper door, push the designated area, and simultaneously switch on the beads and cloth, injecting the hopper coating at any time to ensure three-quarters of the coating is in the hopper, collect the hopper after each barrel, close the gate valve and ball valve, and refill.


Operation Instructions
Usage Steps:
(1) Place the gas cylinder on the hot melt cart, close all valves, and connect the coal and chlorine pipelines.
(2) Hang the required hopper for construction, insert it into the gas pipeline, and check the microbead dispenser system.
(3) Adjust the pointer at the benchmark line on the construction site. (Align the alloy strip of the blade with the water line inside the hopper, then align the pointer with the water line)
(4) Open the gas cylinder switch, ignite the ignition gun, then gradually turn on the oil tank heater and the hopper burner, check if the burner is working properly, after preheating, place the paint on the hot melt kettle, and fill the bead box with glass beads.
(5) One pointer, lower the hopper, open the door, place the paint in the hopper, then open the hopper door, push the delineation, and simultaneously switch on the beads and cloth, injecting the hopper coating at any time, ensuring three-quarters of the coating is in the hopper, after each barrel, collect the hopper, close the gate valve and ball valve, and refill.
Related Notes