这是描述信息
搜索
language
中国
韩国
韩国
韩国
韩国
韩国
Case
Position:
Home
-
-
Case

Construction Notes:
① For road cleaning, an important condition for the firm combination of paint and road is to keep the contact surface clean. Dust, mud and moisture on the road are the main factors that affect the adhesion of the paint.
②. First of all, protect the pavement that needs to be marked so that the marking workers can clean the pavement. The entire working surface section should be thoroughly cleaned up with brooms and brushes. The accumulation should be removed with a shovel. The pavement must be dry and free of stagnant water.
③. The planning work should be stopped when the temperature is lower than 10℃, so as not to affect the adhesion of the marking coating.
④. Blow the cleaned road 1-2 times with a hair dryer to completely remove the dirt in the cracks of the road.

  • Construction site of Qingyuan Expressway hot melt line marking

    Construction site of Qingyuan Expressway hot melt line marking

    Construction site of Qingyuan Expressway hot melt line marking
  • Guanglong high-speed hot-melt marking construction site

    Guanglong high-speed hot-melt marking construction site

    Guanglong high-speed hot-melt marking construction site
  • G35 highway construction site

    G35 highway construction site

    G35 highway construction site
  • Completion site of crosswalk hot-melt marking

    Completion site of crosswalk hot-melt marking

    Completion site of crosswalk hot-melt marking
  • Completion site of hot-melt marking of road speed limit marking

    Completion site of hot-melt marking of road speed limit marking

    Completion site of hot-melt marking of road speed limit marking
  • Parking scribing raw materials Construction case

    Parking scribing raw materials Construction case

    Parking scribing raw materials Construction case
  • Yellow hot melt marking completion site

    Yellow hot melt marking completion site

    Yellow hot melt marking completion site
  • White protruding type deceleration marking construction site

    White protruding type deceleration marking construction site

    White protruding type deceleration marking construction site
  • Protruding hot melt marking construction site

    Protruding hot melt marking construction site

    Protruding hot melt marking construction site
  • Yellow protruding deceleration marking construction site

    Yellow protruding deceleration marking construction site

    Yellow protruding deceleration marking construction site
  • The measurement site of the retroreflective coefficient of the white hot melt marking line

    The measurement site of the retroreflective coefficient of the white hot melt marking line

    The measurement site of the retroreflective coefficient of the white hot melt marking line
  • Yellow hot melt marking retroreflective coefficient measurement site

    Yellow hot melt marking retroreflective coefficient measurement site

    Yellow hot melt marking retroreflective coefficient measurement site
  • Previous page
    1
    2

    Contact Us

    Address: Kechuang Industry,Tianyi Village,Dongcong Town, Nansha District, Guangzhou City, Guangdong Province, CHINA

    +86 13427557901  Ms Vivian 

    ( Whatsapp/Wechat/Line:008613427557901 Skype:vivian34686 )

    Telephone: +86-20-34546872

    Message

    留言应用名称:
    客户留言
    描述:
    验证码

    Bole Road Sign

    CopyRight © Copyright: Guangdong Bole Road Marking Facilities Co.,Ltd.   粤ICP备2021102323号       Power by 300.cn  seo标签